Verified
81, Howe India House, Nehru Place, New Delhi- 110019, India

 

At a Glance

YEAR ESTABLISHED :   1966

 

ANNUAL TURNOVER :

 

2015 – 2016   :  Rs. 2050 Lacs

2014 – 2015   :  Rs. 2017.18 Lacs

2013 – 2014   :  Rs. 795.79 Lacs

 

 

KEY PERSONNEL

  • Sanjeev Dhar
  • Vinod Asthana
  • S.P Anand
  • Amit Mishra
  • Ansar Khan
  • Navneet Vaish
  • Prabhjot Kapoor

 

PERSONNEL EMPLOYED

    • Engineers                           – 69
    • Technicians/Draftsmen  – 5
    • Administrative                  – 10

 

COUNTRIES IN WHICH ASSIGNMENTS TAKEN

 

India, Indonesia, Mauritius, Liberia, Qatar, Salalah, Africa, Sri Lanka, Canada, Iraq, Bahrain, Togo, Singapore, Ghana, Malaysia, Sudan, Saudi Arabia, Guinea, Conakry, Libya, Oman, Kuwait

Brief History

HOWE ENGINEERING PROJECTS (INDIA) PVT. LTD. formerly known as HOWE (INDIA) PVT. LTD. is set up in the year 1966 by Canadian, is now an independent entity offering comprehensive Engineering & Project Management Consultancy Services in India and abroad.

 

Over the past four decades HOWE has done pioneering work in India. Starting with Food & Agriculture Ministry, HOWE has significantly contributed in developing Green & Brownfield Ports & Terminals including India’s very first dedicated, fully mechanized port for Handling Containers & Dry Bulk (JNPT), Modern Container Terminal at Mumbai, Coal & Ore Handling Plants, Bulk Terminals (Goa, Vizag, Ennore, Krishnapatnam, Mundra, Karaikal and many others), and large size Housing / Township (For MHADA in Mumbai and JNPT).

 

 

Services

·        Feasibility studies, Project Appraisals, Financial and Economic Analysis.
·        Technical studies, Project Planning, Detailed Project Reports. Field Investigations and
·        Model Studies (TOR / Scope, Supervision, Interpretation).
·        Detailed Engineering, Drawings, Specifications, Bill of Quantities, Contract Documents.
·        Automation and IT based Solutions.
·        Up‐gradation of old Terminals.
·        Tender Analysis, Assistance in Contract Negotiations and Award of Contracts.
·        Material and equipment procurement services.
·        Construction supervision, Monitoring and Project Management.
·        Quality control and Cost control
·        Organisation and Management studies and evolving operation procedures and operation manuals
·        Training and transfer of technology
·        Problem Solving and Trouble Shooting in respect of Projects.

 

Achievements

·    Recently Completed 50 years of Business with Excellency.
·    Successfully completed the PMC Services of Gangavaram Expansion Project in Visakhapatnam
·    Bagged the prestigious JAL VIKAS MARG Project of WORLD BANK and successfully completed the Designing of 3 of its Terminals and working on the remaining terminals.
·    Added RAILWAY Vertical to our company and successfully bagged two projects of IRCON, which are on-going.

Major Projects Handled

S No. Country Project Title Client Duration
1.                India Consultancy services for basic engineering, detailed engineering, preparation of tender documents, tender evaluation, proof checking and site support for MPT, Goa Adani Mormugao Port Terminal 3 Years
2.                India Engineering Services for Coal Terminal at Ennore Port Chettinanad International Coal Terminal Pvt. Ltd.

 

3 Years
3.                India Design, Engineering and Consultancy Services for Jaypee Gujarat Cement Plant’s proposed Captive Jetty Facilities (CJF) at Kharo Creek in Gujarat

 

Jaiprakash Associates Limited, Noida 5 Years
4.                India Development of Krishnapatnam Port  – Phase I & Phase II (DPR-Detailed Project report)

 

Krishnapatnam Port Company Ltd. (KPCL) 4 Years

 

5.                India Development of  Karaikal Port  – Phase II

 

Karaikal Port Private Limited (KPPL) 2 Years

 

6. India Project Management Consultancy Services for Gangavaram Port Expansion Project at Gangavaram Port, Visakhapatnam Gangavaram Port Limited 2 Years

 

7.                India Consultancy Services for preparation of Detailed Project Report for development of Phase- II of Dhamra Port Dhamra Port Company Limited 1 Year

 

8.                India Consultancy Services for Preparation of Detailed Project Report for Development of Shipyard cum Captive Jetties including LNG terminal at Nana Layja in Kutch District IL&FS Maritime Infrastructure Company Limited 2 Years

 

9.                India Consultancy Services for Detailed Feasibility cum Detailed Project Report for Development of Vijaydurg Port, Maharashtra Privilege Hi-Tech Infrastructure Ltd., Mumbai, 1 Year

 

10.            India Detailed Project Report for Captive Port at Parangipettai, Tamil Nadu IL&FS Maritime Infrastructure Limited 1 Year
11.            India Development of Ship Repair Facility (Slipway) at Pandu, Guwahati, NW-2

 

Inland Waterways Authority of India (IWAI) 1 Year

 

12.            India Consultancy Services for Preparation of Detail Project Report (DPR) for construction of IWT terminal at Sahibganj in Jharkhand on river Ganga (National Waterway–1) in India Inland Waterways Authority of India (IWAI)

 

1 Year

 

13.           

 

India Design and Preparation of Drawings associated with electrification of New B.G Electrified Railway Line in the state of Chattisgarh over South East Central Railway from Kharsia to Dharamjaygarh including Ghargoda- Gare Pelma Spur line

 

IRCON International Limited Ongoing

 

14.            India Consultancy Services for Feasibility Study and Preparation of Detailed Project Report (DPR) including traffic study, land acquisition works and estimating various items in connection with construction of new coal sidings with total approximate length of 50km and five loading yards for 3 MT to 15 MT of coal per annum in Raigarh District in the state of Chhattisgarh in the jurisdiction of SEC Railway

 

IRCON International Limited Ongoing
15.            India Preparation of Detailed Project Report (DPR), Detailed Engineering & Supervision Services for Coal Terminal at Ennore Port

 

Chettinad International Coal Terminal Pvt. Ltd Ongoing

 

16.            India Detailed Feasibility Study for Capacity Augmentation of  National Waterway-1 and Detailed Engineering for its  Ancillary Works and Processes between Haldia to Allahabad  (Jal Marg Vikas Project)

 

Inland Waterways Authority of India (IWAI)

 

Ongoing

 

 

Company Profile-HEPIPL